Get ready: it will be the work of trees and potholes the week that begins in the city of Mendoza


A new course of work will take place on Municipality of the City of Mendoza in the departement. They are related to the maintenance and improvement of trees and green spaces and the repair of streets by sealing with hot and cold materials.

Work in trees and public spaces will be carried out from November 19 to 25while correcting the work They will start on the 22nd and continue until the 26th of the month.

Details of the work:

fork

The limbing of low branches will be carried out on the street and the sidewalk, the clearing of lights, road signs in Salta Street near Lavalle; and the pruning and eradication of dry and degraded forests located in the neighborhood of San Martín.

Planting

Planting of new trees in specific addresses in the city of Mendoza.
Training in pruning and placement of new forest trees in the neighborhood of San Martín.

operational 360

Limbing and clearing of poorly located branches that are very low, affecting traffic on the sidewalk and/or street. Cleaning of light fixtures and traffic signs. All work will be carried out in the Fourth Section East area.

Irrigation

A manto: Videla Correa street to the north, from 25 de Mayo street to Av. San Martín.
By reservoir: irrigation in the West districts, Fourth Section East, First, Third, Fifth and Sixth Section.

Green spaces

Cleaning, irrigation and maintenance work will be carried out in all the places of the City and the disinfection of children’s games, benches and baskets.

Italia, España and San Martín squares:
– improvement of flowerbeds, reorganization and addition of flowering plants;
– bush pruning.

Independence Square:
– addition of shrubs in the income-generating sector of Sarmiento;
– improvement of flowerbeds, reorganization and addition of flowering plants;
– reseeding and fertilizing grass;
– painting of lampposts, piles and garbage cans;
– renovation of floors with neutral detergents and degreasers.

Milestone of Alpatacal Street and Ferroviarios Argentinos:
– enhancement of the monument.

UCIM property:
– cleaning, weeding and pruning;
– repairs at source;
– stonemason’s design at the entrance;
– improvement with granille.

Access to the city (Pedro B. Palacios and Vicente Zapata):
– Preparation of the soil in the new planting bed;
– placement of shrubs and flowers according to the design.

Kindergarten Sunflowers:
– cleaning, weeding and pruning.

The scale – Cultural warehouse:
– connection and installation of a water tank for the event.

Disinfection and sanitation of public spaces

The disinfection tasks will be carried out with sodium hypochlorite and the washing of the rubber floors of the children’s games in the squares: España, Independencia, Cobo, Yrigoyen, Parque O’Higgins, Caseros, Sarmiento.

In addition, disinfection will be carried out in the exercise areas of: Paseo Palero, Nicolino Locche Linear Park and the Champagnat, Soberanía and Sanidad neighborhoods.

Wet cleaning of the floors with sodium hypochlorite in the squares: Independencia, Yrigoyen, Cobo, Sarmiento, Italia, Chile and Paseo Alameda.

The disinfection of the places occupied by the artisans of Paseo Villalonga and Plaza Independencia is reinforced.

Washing and disinfection of games located at PROCREAR.

Wet cleaning of galleries and streets belonging to the cemetery.

Batch work schedule:

Crew N°1: equipment to use cold patching
11/22 Morón Street, between Av. San Martín and Salta
11/23 H. Yrigoyen Street, between Av. San Martín and Av. Belgrano
11/24 on Calle España, between H. Yrigoyen and Av. Peltier
11/25 rue 9 de Julio, between Av. Peltier and H. Yrigoyen
11/26 jobs to be designated

Crew N°2: equipment to use cold patching
11/22 Santiago del Estero street, between Montecaseros and Paraguay
23/11 Santiago del Estero Street, between Paraguay and B. de Arrollabes
11/24 Tucumán Street, between J. Jufré and Av. San Martín
11/25 on Ayacucho Street, between Paraguay and San Martín Avenue.
11/26 jobs to be designated

Squad N° 3: equipment to use hot patching
11/22 Corrientes Street, between Av. San Martín and Ituzaingo
11/23 on San Juan Street, between Catamarca and Lavalle
11/24 on San Juan Street, between Catamarca and Lavalle
11/25 San Luis Street, between San Juan and Rioja
11/26 jobs to be designated

Squad #4: material to be used for the cold patch
Walkthrough of Claims Taken

Leave a Comment

Your email address will not be published. Required fields are marked *